Due West Carpentry & Renovations Ltd. | Bathroom Remodelling Company | Page 5 | Value, Integrity, Craftsmanship | BBB Accredited Bathroom Renovation Business on the North Shore of Vancouver B.C.

Additions   Basements   Bathrooms   Construction   Doors/Windows   Exterior Finishing   Interior Finishing
    Gallery  Bathrooms
    - Home Page -   Commercial Gallery      Kitchens   Restorations   Remodelling   Sundecks   Recent Projects
    < Previous Page   (Now viewing Page 5 of 5)
Date: 2008   Client: Najwa Green
Project description: Remodel entire Rental house, Including all 3 bathrooms with major structural restorative work conducted in 2 bathrooms.   Bathroom Renovation Location: In West Vancouver on the North Shore of Vancouver B.C.
Bathroom 1 (Main bath) After Photo's Below:
Zoom Zoom Zoom Zoom
  • This Project has a Letter of 'Reference' (Direct Link)
  • This Client has a Kitchen Fully Featured in our 'Kitchens' Gallery (Link to More Photos)
  • This Client has an entire House Renovation Featured in the 'Remodelling' Gallery (Link)

    Points of Interest: The client was out of town during this rental house renovation which took about 2.5 months and included the renovation and restoration of: 3 bathrooms, a redesigned kitchen, new water lines throughout, hardwood floor refinishing and carpets/tile thoughout, recessed lights through out (Aprox. 50) fireplace redesign, new railings, basement refinishing, laundryroom restoration, window replacement throughout, all interior & exterior door replacements, new deck components, chimney rebuilds, new gutters & fascia, new retaining walls, perimeter drainage replacement, moldings throughout, interior painting, exterior painting and so on.

    Design elements: This project was budgeted as a rental house, but as I am always striving to impress, the idea here was to implement a Zen spa flavour to the tub area which I knew my client would appreciate as her career involves Spa development which has included the original Spa Devlopement at the Pan Pacific Hotel.

      A center drain spa style tub was utilized with the tub spout located in the center so that you can sit in either direction in the tub. The tub skirt is replaced with tile and the wall edge was capped to reduce the tile veneer look for a more natural appearance. Post form wrap Italian laminate door facings and a laminate counter that appears as brushed metal was used with a precise install, as no back splash was to be used. I chose a tumbled stone inlay and vertically inverted each second row to provide a nice effect with the 'stacked' tile.

    The details: As usual I used a tile base curb for easy maintenance and longevity. I designed the cabinet doors and drawers to have equal panel widths for continuity. The doors are also full height from the counter to the floor.

    Unexpected: Major structural damage from leaking tubs which included the replacement of a lower weight bearing wall and repair of an upper weight bearing wall. Floor joists under the bathroom had to be replaced as did two of the 14ft supporting floor joists under the bedroom which was accomplished without removing the hardwood flooring and without the floors squeaking when you walk on it.
      - Click Here -for Water ingression indication photo.


  • Due West Carpentry and Renovations Ltd is a BBB Accredited Business. Click for the BBB Business Review of this Home Improvements - Additions in Vancouver BC


    Zoom
    Bathroom 1 (Main) Continued.... Before, During, underneath and after photo's below:
    Note: All the light colored wood in the pictures are Replacement pieces
    Zoom Zoom Zoom Zoom
    Zoom Zoom Zoom Zoom
    Zoom Zoom Zoom Zoom
     Bathroom 2 (Basement)   After, During and Before Photo's Below
    Zoom Zoom Zoom Zoom Zoom
  • The Basement Bathroom was obviously put in as a bare necessity many years ago.
  • Shower Drain location relocated to accomodate new shower basin.
  • A bathroom fan was introduced and the ceiling was 'drop framed' and drywalled, eliminating the ceiling tiles.
  • Heating & Insulation was implemented in the outside walls including the foundation wall area.
  •  Bathroom 3 (Ensuite)  After Photo's Below
    Zoom Zoom Zoom Zoom
  • The Ensuite Bathroom required some minor structure repair around the tub.
  • The entire back wall was shimmed out (furred out) to remove a 1" jog at the end of the tub.
  • New recessed lighting, doors, windo & bathroom fan were implemented.
  • Bathroom 3 (Ensuite) Continued... After, before and during photo's below
    Zoom Zoom Zoom Zoom Zoom
        < Previous Page   (Now viewing Page 5 of 5)
    "The Details Always Determine the Outcome"